City of Highland |
A 17,000 SF design-build effort, including apparatus bays with gear storage |
Fire Station |
and maintenance. Peck Ormsby worked extensively with the architect to value |
Highland, Utah |
engineer and redesign the project to fit the owner's budget and needs. |

|
|
Freedom Academy |
Project is a 63,000 SF full-service school for grades K - 8 located in Provo, Utah. |
Charter School |
The project is wood framed and masonry construction including site and traffic |
Provo, Utah |
control. It was built on a fast track schedule to be ready for school by fall 2007. |

|
|
Angelina's Corner |
This project is a 36,000 SF mixed-use development which combines commercial |
Housing Development |
and retail space with condominiums for a down-town "live-work" environment. |
Salt Lake City, Utah |
Extensive value-engineering was done to reduce costs & meet the owner's budget. |

|
|
Brigham Young University |
Project involves the replacement of high end architectural handrail systems, |
Campus Handrail Project |
bringing critical areas to current safety standards and consistent design standards. |
Provo, Utah |
All work was done around BYU's schedule and activities. |

|
|
Monticello Academy |
Project is a 58,000 SF full service school for grades K - 8 located in West Valley, |
Charter School |
Utah. The two story building is wood framed and masonry construction with a |
West Valley , Utah |
full kitchen, cafeteria, gymnasium, library,and classrooms. |

|
|
| Brigham Young University |
This project involved excavation and preparation of a five acre site for use as |
| Intramural Fields |
intramural play fields for BYU. Work included play fields, parking lot, sidewalks, |
| Provo, Utah |
fencing & netting and lighting throughout the entire site for night activities. |

|
|
| Brigham Young University |
Renovation of Lavell Edwards Stadium which included repainting the entire |
| Lavell Edwards Stadium Upgrade |
structure, remodeling of visiting teams offices, preparation area, locker room, |
| Provo, Utah |
and media conference room. Work was completed around BYU's schedule. |

|
|
| Brigham Young University |
|
| Project includes a 4,200 SF remodel of what was the Campus Police Station into |
| Smoot / Kimball Buildings Remodel |
new office space in the Abraham Smoot Building. Remodel of office space on the |
| Provo, Utah |
7th and 9th floors of the Spencer W. Kimball building. |

|
|
| Brigham Young University |
A small, but technically detailed project, including a 4,300 SF addition of chemical |
| Chemical Management Building |
storage, management and distribution space, plus a major remodel and upgrade of |
| Provo, Utah |
2,000 SF of existing office space. |

|
|
| Bank of American Fork |
An 8,400 SF building with a 4-lane covered drive through. Includes a daylight |
| Riverton Branch |
basement, two cast in place vaults, high-tech electrical and IT packages, specialty |
| Riverton, Utah |
equipment and high end millwork. |

|
|
| Division of Wildlife Resources |
This small project includes demolition of existing buildings and erection of a |
| Springville Fish Hatchery |
pre-engineered metal building on a very tight schedule - our initial foray into the |
| Springville, Utah |
DFCM project arena |

|
|