Dan W. Peterson |
Project is a 7,019 SF expansion that added new classrooms, restrooms and |
School Addition |
storage area. Construction took place while school was in session and special |
American Fork, Utah |
care and coordination was required to avoid disruptions to the school. |

|
|
| Sego Lily Elementary |
Project is a 21,000 SF expansion along the front of the school in Lehi, Utah. |
| Classroom Expansion |
Expansion includes 12 new classrooms and new offices as well as site work. Also |
| Lehi, Utah |
includes a small remodel of the school. Work was done with school in session. |

|
|
Provo Housing Authority |
This project provides covered parking for two apartment buildings in Provo, |
Covered Parking |
Utah along with other site improvements. This project is federally funded and |
| Provo, Utah |
includes federal regulations that must be met. |

|
|
Channing Hall |
Project is a 4,000 SF addition to the existing 43,000 SF building located in |
Classroom Addition |
Draper, Utah. It added 4 classrooms as well as office space. Peck Ormsby was |
| Draper, Utah |
selected due to their extensive charter school experience and low cost. |

|
|
Quail Run |
This design build project will be the first LEED certified charter school in the state |
Primary School |
of Utah. The building is a 55,000 SF two story school which incorporates many |
| Pleasant Grove, Utah |
sustainable features including solar panels and an energy efficient HVAC design. |

|
|
Vista School |
Project is a two story 21,000 SF addition to the existing 39,000 SF school which |
Addition |
was Peck Ormsby built in 2009. Project added classrooms, office area, restrooms |
| St. George, Utah |
as well as a performing theater. Project was completed on a fast track schedule. |

|
|
| Karl Maeser Academy |
Project is a new 48,000 SF design build high school in Lindon, Utah. The building |
| High School |
sits on an 8 acre site which includes a soccer field and track area. The building |
| Lindon, Utah |
features an EIFS exterior with large columns at the raised entryway. |

|
|